KRSuper2 Aircraft Construction Log

Build site of a KRsuper2!

Fuselage
detailed progress report

Monday, July 13, 2009 - 2 Hours


Summary: Fuselage

Details: Cutout foam floor from template



Sunday, July 12, 2009 - 2 Hours


Summary: Fuselage floor

Details: Made templates for fuselage floor



Saturday, July 11, 2009 - 2.5 Hours


Summary: Fuselage

Details: Modified control tunnel top, lay up for rudder pedal area



Thursday, July 09, 2009 - 2 Hours


Summary: Fuselage

Details: Misc



Wednesday, July 08, 2009 - 1.5 Hours


Summary: Fuselage

Details: Misc



Tuesday, July 07, 2009 - 2 Hours


Summary: Fuselage

Details: Misc



Sunday, July 05, 2009 - 2 Hours


Summary: Fuselage

Details: Miscellaneous



Thursday, July 02, 2009 - 2 Hours


Summary: Fuselage

Details: Engine mount



Wednesday, July 01, 2009 - 2.5 Hours


Summary: Fuselage

Details: Engine mount



Sunday, June 28, 2009 - 2 Hours


Summary: Fuselage

Details: Misc items



Sunday, June 28, 2009 - 2 Hours


Summary: Fuselage

Details: Worked misc fuselage items



Tuesday, June 23, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on misc items



Monday, June 22, 2009 - 2.5 Hours


Summary: Fuselage

Details: Worked on misc items



Sunday, June 21, 2009 - 3 Hours


Summary: Control tunnel

Details: Installed control tunnel in fuselage



Saturday, June 20, 2009 - 3 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Sunday, June 14, 2009 - 2 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Friday, June 12, 2009 - 1.5 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Thursday, June 11, 2009 - 1 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Tuesday, June 09, 2009 - 1.5 Hours


Summary: Control Tunnel

Details: Worked on control tunnel



Monday, June 08, 2009 - 3 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Sunday, May 24, 2009 - 2 Hours


Summary: Alignment

Details: Aligned empennage onto fuselage



Saturday, May 23, 2009 - 3.5 Hours


Summary: Fuselage

Details: Upper motor mounts



Tuesday, May 05, 2009 - 1 Hours


Summary: Fuselage

Details: Riveted in the nutplates for the seat back



Monday, May 04, 2009 - 1 Hours


Summary: Fuselage

Details: Glasssed over wood inserts and drilled rivet holes on seat back flange



Sunday, May 03, 2009 - 2 Hours


Summary: Fuselage

Details: Riveted nutplates to the inspection hole. Drilled holes for the seat back nutplates. Cut out holes for wooden inserts and floxed them in place.



Friday, May 01, 2009 - 1.5 Hours


Summary: Fuselage

Details: Prepped the inspection hole for riveting the nutplates. Riveted the nutplates into position



Tuesday, April 28, 2009 - 1 Hours


Summary: Wing ribs

Details: Micro’d some of the rib edges



Saturday, April 04, 2009 - 3 Hours


Summary: Fuselage

Details: Sanded flox and reshaped the saddle to 1 degree angle. Floxed and laid up the flange.



Thursday, April 02, 2009 - 3 Hours


Summary: Fuselage

Details: Floxed the saddle for the H-Stab flange.



Wednesday, April 01, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded out saddle and shaped the sides. Smoothed out the inside panels.



Tuesday, March 31, 2009 - 2.5 Hours


Summary: Fuselage

Details: Decided to grind out the saddle and reshape it to get a 1 degree angle of incidence. Reapplied flox and set up the H-stab



Monday, March 30, 2009 - 1 Hours


Summary: Fuselage

Details: Mulled over how the H-stab should be aligned and how to determine the angle of incidence



Sunday, March 29, 2009 - 3 Hours


Summary: Fuselage

Details: Cut out Horizontal-Stab saddle, sanded and shaped the firewall reinforcements. Floxed in the saddle



Saturday, March 28, 2009 - 3 Hours


Summary: Fuselage

Details: Glassed remaining reinforcements in the bottom of the firewall



Friday, March 27, 2009 - 4 Hours


Summary: Fuselage

Details: Glassed the other sides of the control tunnel, sanded the leading edge of the vertical stab. Glassed 3 reinforcements on the firewall with BID



Wednesday, March 25, 2009 - 2.5 Hours


Summary: Fuselage

Details: Micro’d and glassed the control tunnel sides. Fabricated a top bulkhead piece. Made triangle reinforcements and CA’d them into place on the firewall inside



Tuesday, March 24, 2009 - 1 Hours


Summary: Fuselage

Details: Cut out control tunnel parts and prepped for glassing



Saturday, March 21, 2009 - 3 Hours


Summary: Fuselage

Details: Prepped the front inside firewall and applied Carbon Fiber. Also glassed the antenna connections



Friday, March 20, 2009 - 3 Hours


Summary: Fuselage

Details: Sanded inside of the tail , micro’d and glassed it up



Monday, March 16, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on reforming the tail



Monday, March 16, 2009 - 2 Hours


Summary: Empennage

Details: Repaired tail and micro’d the V-stab



Sunday, March 08, 2009 - 5 Hours


Summary: Fuselage

Details: Solder up the antenna connections. Glassed over the antennas and fabricated the tail section to bring it up to level.



Saturday, March 07, 2009 - 4 Hours


Summary: Fuselage

Details: Glassed the inside of the header



Monday, March 02, 2009 - 2 Hours


Summary: Fuselage

Details: Cleaned up inside fuselage and seat flanges. Istalled Marker Beacon antenna. Drilled out inspection plate attachment holes



Sunday, March 01, 2009 - 5 Hours


Summary: Fuselage

Details: Layed up and formed the header



Tuesday, February 24, 2009 - 2 Hours


Summary: Fuselage

Details: Glassed up the front side of the seat flanges



Monday, February 23, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Sunday, February 22, 2009 - 5 Hours


Summary: Fuselage

Details: Laid up the firewall with 6 layers of BID.



Saturday, February 21, 2009 - 3 Hours


Summary: Fuselage

Details: Made flanges for the seatback



Thursday, February 19, 2009 - 2 Hours


Summary: Fuselage

Details: Floxed in the left longeron



Wednesday, February 18, 2009 - 2 Hours


Summary: Fuselage

Details: Floxed in the right longeron. Many clamps!



Tuesday, February 17, 2009 - 2 Hours


Summary: Fuselage

Details: Cut out the longeron inserts and leveled the fuselage.



Monday, February 16, 2009 - 4 Hours


Summary: Fuselage

Details: Layed up the rear, mid, and baggage bulkheads with BID



Sunday, February 15, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded to shape the header and seat back. Micro’d the mid-bulkhead and baggage bulkhead into position. Micro’d the edges of the inspection plate



Saturday, February 14, 2009 - 4 Hours


Summary: Fuselage

Details: Sanded and Micro’d bulkheads and fitted into place. Cut out inspection hole, sanded and put into place to make lay-up for flange. Laid up 6 layers of BID



Thursday, February 12, 2009 - 2 Hours


Summary: Fuselage

Details: Installed rear bulkhead



Wednesday, February 11, 2009 - 4 Hours


Summary:

Details: Sanded and fitted the rear bulkheads. Floxed in the rear bulkhead. Glassed the other side of the seat back – BID. Glassed both sides of the firewall support.



Tuesday, February 10, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Monday, February 09, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Sunday, February 08, 2009 - 4 Hours


Summary: Fuselage

Details: Sanded the fuselage, cut and shaped the bulkheads, glassed one side of the seat back – 1 UNI and 1 BID



Saturday, February 07, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Thursday, February 05, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Monday, February 02, 2009 - 2 Hours


Summary: Fuselage

Details: Helped Paul micro and lay up the inner radius and micro’d his bulkheads



Saturday, January 31, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded and prepped the inside of the fuselage. Joined fuse sections



Friday, January 30, 2009 - 3 Hours


Summary: Fuselage

Details: Sanded again and added more micro to smooth out the transition edges



Thursday, January 29, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded the inner radiuses of the fuselage and added micro to them



Wednesday, January 28, 2009 - 5 Hours


Summary:

Details: Put fuselage on the formers and micro’d in the radius strips. Scored my rear fuselage with more relief lines. Micro’d the openings. Sanded inner front radiuses.



Tuesday, January 27, 2009 - 2 Hours


Summary: Fuselage

Details: Floxed firewall to front of fuselage



Monday, January 26, 2009 - 4 Hours


Summary: Fuselage

Details: Checked alignment of the front firewall mount. Cut out firewall and glassed both side



Sunday, January 25, 2009 - 4 Hours


Summary: Fuselage

Details: Lined up Fuselage halves and then glassed them together



Friday, January 23, 2009 - 3 Hours


Summary: Chris - fuselage

Details: Cut rear fuse bottom and aligned for attachment to the front fuselage bottom.



Thursday, January 22, 2009 - 2.5 Hours


Summary:

Details: Slurried and applied 1 layer of UNI and 1 layer of BID to the left side of the fuselage. Covered with peel-ply



Wednesday, January 21, 2009 - 3 Hours


Summary: Chris - fuselage

Details: Slurried and applied 1 layer of UNI and 1 layer of BID to the right side of the fuselage. Covered with peal-ply.



Tuesday, January 20, 2009 - 2 Hours


Summary: Chris - fuselage

Details: Sanded and micro filled the fuselage radius



Monday, January 19, 2009 - 2 Hours


Summary: Chris - fuselage

Details: Cut out bulkheads and sanded the fuselage radius



Sunday, January 18, 2009 - 4 Hours


Summary: Chris - fuselage

Details: Micro’d and glassed the backsides of the bulkheads and then sanded the fuselage



Saturday, January 17, 2009 - 6 Hours


Summary: Chris - Assist Fuselage

Details: Micro’d 1.5” strips on Fuselage to fill in the gaps. Cut out bulkheads and laid them up with fiberglass and micro



Friday, January 16, 2009 - 4 Hours


Summary: Fuselage

Details: Built Formers “C” and “E” and then attached them to the fuselage. Cut out 12 – 1.5” strips of ½” foam and micro’d them onto the fuselage to form the fuselage radius.



Wednesday, January 14, 2009 - 3 Hours


Summary: Assemble fuselage formers

Details: Built forms for fuselage and attached bottom and sides to the forms



Sunday, January 11, 2009 - 4 Hours


Summary: Rear fuselage

Details: Glassed fuse rear



Monday, January 05, 2009 - 2.5 Hours


Summary: Fuselage bottom

Details: Sanded joggle in bootom, other layups



Saturday, January 03, 2009 - 5 Hours


Summary: Fuselage bottom

Details: Slurried and glassed rear bottom fuse.



Saturday, January 03, 2009 - 5.5 Hours


Summary: Fuselage bottom

Details: Slurried and glassed the other side of the rear bottom fuse



Friday, January 02, 2009 - 3 Hours


Summary: Rear bottom fuselage

Details: Fit and micro’d together the rear bottom fuse.



Thursday, January 01, 2009 - 2 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Sunday, December 28, 2008 - 5 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Sunday, December 21, 2008 - 2.5 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Saturday, December 20, 2008 - 3 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Saturday, December 20, 2008 - 4 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Friday, December 19, 2008 - 1.5 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Thursday, December 18, 2008 - 2.5 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Wednesday, December 17, 2008 - 2 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Tuesday, December 16, 2008 - 2 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Monday, December 15, 2008 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Sunday, December 14, 2008 - 4 Hours


Summary: Fuselage

Details: Worked on fuse sides



Sunday, December 07, 2008 - 7 Hours


Summary: Fuselage sides

Details: Layed up fuselage sides



Monday, December 01, 2008 - 2 Hours


Summary: Fuselage

Details: Sanded joggles into the front fuselage sides and cut out pieces for rear bottom (tail cone) of the fuselage



Sunday, November 30, 2008 - 3 Hours


Summary: Fuselage construction begins!

Details: Cut out front bottom and front sides for Fuselage.






last update
.............................................................
SITE WAS UPDATED ON
Tuesday, October 20, 2009

contact
.............................................................
SEND AN EMAIL
paulskrsuper2 @ gmail.com


construction
detailed progress
.............................................................
Empennage131 Hours
Fuselage267 Hours
Wing54 Hours
Shop Supplies2 Hours
Miscellaneous11.6 Hours

.............................................................
CURRENTLY WORKING ON
Fuselage

TOTAL AIRCRAFT BUILD TIME
465.6 Hours

PROGRESS CHARTS




specs
.............................................................
Length
19'
Wing Span
24'
Total Wing Area
93 ft^2
Empty Weight
750
Gross Weight
1200
Useful Load
450
Fuel Cap
26 gal
Stall Speed
48 mph
Maximum Speed
170 mph
Cruise Speed
140 mph
Range
600 miles
Engine
Corvair 2700
Power Loading
100 hp
Wing loading
12 lbs/hp
Power Loading
12.5 lbs/ft^2
Fuel consumption 5.5 gph
Seating 2 across
Gear Tri-Gear
Cabin Width 43"