krsuper2
Chris's build site for the
construction
CURRENTLY WORKING ON
Fuselage

TOTAL AIRCRAFT BUILD TIME
750.42 Hours

PROGRESS CHARTS







DETAILED PROGRESS

Empennage 376.5 Hours
Fuselage 306.28 Hours
Wing 50.5 Hours
Shop Supplies 2 Hours
Miscellaneous 13.6 Hours
Tools 1.01 Hours
Diversion time 0.5 Hours
Canopy 0.03 Hours

BACK TO MAIN


last update
SITE WAS UPDATED ON
Monday, May 31, 2010

contact 
SEND AN EMAIL
Chris @ digflying.com

specs 
WHAT MAKES IT TICK
Length                   19'
Wing Span             24'
Total Wing Area     93 ft^2
Empty Weight         750
Gross Weight        1200
Useful Load           450
Fuel Cap                26 gal
Stall Speed            48 mph
Maximum Speed    170 mph
Cruise Speed        140 mph
Range                    600 miles
Engine                   Corvair 2700
Power                   100 HP
Power Loading     12 lbs/hp
Wing loading         12.5 lbs/sq ft
Fuel consumption  5.5 gph
Seating                  2 across
Gear                      Tri-Gear
Cabin Width           43"

disclaimer
THE LEGALESE
This website was built to document my work on my KRSuper2 in compliance with the FAA requirements needed to certify my aircraft. My experiences and comments are by no means to be considered as instructions on how to build a KRSuper2 or any other aircraft.

A Modern take on a classic aircraft with an all composite design
Fuselage
welcome
detailed progress report

Monday, May 31, 2010 - 2.5 Hours


Summary: Turtle deck

Details: Laid out the foam for the turtle deck and micro'd the pieces together.



Sunday, May 30, 2010 - 1.5 Hours


Summary: Turtle deck

Details: Finished the turtle deck frame.



Saturday, May 29, 2010 - 2 Hours


Summary: Turtle Deck

Details: Assembled the turtle deck frame.



Friday, May 28, 2010 - 1.5 Hours


Summary: Turtle deck

Details: Cut out Masonite to form the turtle deck frame.



Thursday, May 27, 2010 - 1 Hours


Summary: Turtle Deck

Details: Made templates for the rest of the turtle deck.



Sunday, May 23, 2010 - 1 Hours


Summary: Canopy work

Details: Positioned the canopy to get the max height and then made a template for the backside of the canopy. Worked out the shape of the turtledeck.



Monday, May 17, 2010 - 1 Hours


Summary: Canopy

Details: Taped up the border on the canopy and covered it with spray lat.



Thursday, May 13, 2010 - 2 Hours


Summary: Canopy Frame

Details: Built the frame for the canopy to sit on.



Sunday, May 09, 2010 - 0.01 Hours


Summary: Flange work

Details: Cleaned up the flange and watched Paul work out the alignment for the canopy.



Saturday, May 08, 2010 - 2 Hours


Summary: Flanges

Details: Worked on flanges for the front part of the fuselage. Paul worked on getting everything lined up on the canopy.



Wednesday, April 28, 2010 - 0.5 Hours


Summary: Flanges

Details: Finished out the flange and drank a 6 pack with Paul.



Tuesday, April 27, 2010 - 2.5 Hours


Summary: Flanges

Details: Prepped the right side for the flange and laid up 2 layers of BID.



Monday, April 26, 2010 - 3 Hours


Summary: Flange for the turtle deck

Details: Prepped left side for flange and laid up 2 BID of glass to form the flange. Paul set up the turtle deck and worked to get it to shape and line up.



Saturday, April 24, 2010 - 0.01 Hours


Summary: Turtle Deck

Details: Paul built a frame and laid up foam for the turtle deck.



Friday, April 23, 2010 - 0.01 Hours


Summary: Turtle Deck

Details: Paul - Made up templates for the turtle deck.



Sunday, April 11, 2010 - 1.5 Hours


Summary: Fuselage

Details: Body work!!!! They call it body work for a reason, that is why it is not called body fun!



Sunday, April 04, 2010 - 3 Hours


Summary: Fuselage

Details: Body work.



Friday, April 02, 2010 - 2 Hours


Summary: Fuselage

Details: Body work. Still waiting on the canopies to come.



Thursday, April 01, 2010 - 2 Hours


Summary: Fuselage

Details: More body work.



Sunday, March 28, 2010 - 4 Hours


Summary: Fuselage

Details: Did more body work.



Thursday, March 25, 2010 - 1 Hours


Summary: Fuselage

Details: More body work.



Wednesday, March 24, 2010 - 2 Hours


Summary: Fuselage

Details: More body work. Tried putting a sheet of peelply on and it didn't really help.



Sunday, March 14, 2010 - 1.5 Hours


Summary: Lower fuselage

Details: Continued to sand the bottom of the fuse and laid down some more micro.



Saturday, March 13, 2010 - 0.5 Hours


Summary: Fuselage bottom

Details: Sanded the micro on the bottom of the fuselage.



Sunday, November 29, 2009 - 1 Hours


Summary: Floor panel

Details: Sanded the top of the floor panel and applied 2 layers of BID to the top seam.



Saturday, November 28, 2009 - 2.5 Hours


Summary: Floor panel

Details: Sanded down teh micro on the bottom floor panel and laid up 2 layer BID down the seam.



Friday, November 27, 2009 - 1 Hours


Summary: Floor panel

Details: Micro'd the top and bottom panels together.



Monday, November 23, 2009 - 2 Hours


Summary: Floor boards

Details: Sanded the floor board into shape. Fit it all together, plucked out the edge foam and filled with micro.



Sunday, October 11, 2009 - 3 Hours


Summary: Floor

Details: Worked on floor- cut and sanded panels. Epoxied the supports onto the floor. Worked on rudder spar and glassed both sides.



Friday, October 09, 2009 - 0.5 Hours


Summary: Control tunnel

Details: Cleaned up flange on control tunnel and riveted another nutplate.



Tuesday, August 11, 2009 - 2 Hours


Summary: Foot rest lay up.

Details: Laid up boards for foot rest and backplate cover. Paul made hard points for attaching the control horn to the doublers.



Tuesday, July 14, 2009 - 2 Hours


Summary: Control tunnel cover and fuse floor

Details: Sanded up the control tunnel to fit. Cut floor panel to fit.



Monday, July 13, 2009 - 2.5 Hours


Summary: Fuselage

Details: Worked on control tunnel top, Cut out foam floor from template for the rudder pedals. Fabricated nutplates for rudder spar.



Sunday, July 12, 2009 - 2 Hours


Summary: Fuselage floor

Details: Worked on floor bottom and control tunnel top.



Saturday, July 11, 2009 - 3 Hours


Summary: Fuselage

Details: Laid up foam for floor panels. Joined contol tunnel top.



Friday, July 10, 2009 - 0.5 Hours


Summary: Floor Template

Details: Made template for floor panel.



Thursday, July 09, 2009 - 0.5 Hours


Summary: Fuselage- Rudder cable exits

Details: Micro'd rudder cable exit tubes into place.



Wednesday, July 08, 2009 - 0.5 Hours


Summary: Fuselage

Details: Joined control tunnel halves.



Tuesday, July 07, 2009 - 0.25 Hours


Summary: Fuselage - rudder cable exit holes.

Details: Drilled holes for rudder cables.



Sunday, July 05, 2009 - 2 Hours


Summary: Fuselage

Details: Miscellaneous



Thursday, July 02, 2009 - 3 Hours


Summary: Fuselage -Engine mounts.

Details: Laid up top right engine mounts.



Wednesday, July 01, 2009 - 2.5 Hours


Summary: Fuselage Engine mount

Details: Laid up top left engine mount.



Tuesday, June 30, 2009 - 1 Hours


Summary: Fuselage

Details: Sanded tunnel and prepped front firewall for top engine mounts. Paul laid up the motor mounts on his bird.



Monday, June 29, 2009 - 2 Hours


Summary: Control tunnel

Details: Prepped control tunnel for glassing and then glassed it into place.



Sunday, June 28, 2009 - 2 Hours


Summary: Fuselage - Control tunnel

Details: Sanded down the flange on the control tunnel. Cut covers to fit and micro'd the tunnel into place.



Tuesday, June 23, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on misc items



Monday, June 22, 2009 - 2 Hours


Summary: Fuselage - tunnel flange and V-Stab pulley

Details: Floxed in opposite side of the Vertical Stab attach points for the pulley. Sanded tunnel cover to shape and laid up glass to form the flange.



Sunday, June 21, 2009 - 2.5 Hours


Summary: Control tunnel

Details: Cut out a control tunnel top and micro'd the edges. Floxed in one side of the aluminum attach point for the elevator pulley. Paul Installed his control tunnel in fuselage.



Saturday, June 20, 2009 - 3 Hours


Summary: Control tunnel

Details: Worked on control tunnel- Glassed over the reinforcements on the control tunnel, filled in elevator spar with micro. Cut up aluminum inserts for Vertical stab and drilled them out. Cut out glass for inserts and prepped for floxing in .



Friday, June 19, 2009 - 2 Hours


Summary: Control tunnel

Details: Glassed up some foam to make the top for the control tunnel.



Sunday, June 14, 2009 - 2 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Friday, June 12, 2009 - 1.5 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Thursday, June 11, 2009 - 1 Hours


Summary: Control tunnel

Details: Worked on control tunnel. Cut out holes for installing the hard points.



Tuesday, June 09, 2009 - 1.5 Hours


Summary: Control Tunnel

Details: Worked on control tunnel



Monday, June 08, 2009 - 3 Hours


Summary: Control tunnel

Details: Worked on control tunnel



Tuesday, May 05, 2009 - 1 Hours


Summary: Fuselage

Details: Riveted in the nutplates for the seat back



Monday, May 04, 2009 - 1 Hours


Summary: Fuselage

Details: Glasssed over wood inserts and drilled rivet holes on seat back flange



Sunday, May 03, 2009 - 2 Hours


Summary: Fuselage

Details: Riveted nutplates to the inspection hole. Drilled holes for the seat back nutplates. Cut out holes for wooden inserts and floxed them in place.



Friday, May 01, 2009 - 1.5 Hours


Summary: Fuselage

Details: Prepped the inspection hole for riveting the nutplates. Riveted the nutplates into position



Tuesday, April 28, 2009 - 1 Hours


Summary: Wing ribs

Details: Micro’d some of the rib edges



Saturday, April 04, 2009 - 3 Hours


Summary: Fuselage

Details: Sanded flox and reshaped the saddle to 1 degree angle. Floxed and laid up the flange. Paul worked on his V-Stab flange.



Thursday, April 02, 2009 - 3 Hours


Summary: Fuselage

Details: Floxed the saddle for the H-Stab flange.



Wednesday, April 01, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded out saddle and shaped the sides. Smoothed out the inside panels.



Tuesday, March 31, 2009 - 2.5 Hours


Summary: Fuselage

Details: Decided to grind out the saddle and reshape it to get a 1 degree angle of incidence. Reapplied flox and set up the H-stab



Monday, March 30, 2009 - 1 Hours


Summary: Fuselage

Details: Mulled over how the H-stab should be aligned and how to determine the angle of incidence



Sunday, March 29, 2009 - 3 Hours


Summary: Fuselage

Details: Cut out Horizontal-Stab saddle, sanded and shaped the firewall reinforcements. Floxed in the saddle



Saturday, March 28, 2009 - 3 Hours


Summary: Fuselage

Details: Glassed remaining reinforcements in the bottom of the firewall



Friday, March 27, 2009 - 4 Hours


Summary: Fuselage

Details: Glassed the other sides of the control tunnel, sanded the leading edge of the vertical stab. Glassed 3 reinforcements on the firewall with BID



Wednesday, March 25, 2009 - 2.5 Hours


Summary: Fuselage

Details: Micro’d and glassed the control tunnel sides. Fabricated a top bulkhead piece. Made triangle reinforcements and CA’d them into place on the firewall inside



Tuesday, March 24, 2009 - 1 Hours


Summary: Fuselage

Details: Cut out control tunnel parts and prepped for glassing



Saturday, March 21, 2009 - 3 Hours


Summary: Fuselage

Details: Prepped the front inside firewall and applied Carbon Fiber. Also glassed the antenna connections



Friday, March 20, 2009 - 3 Hours


Summary: Fuselage

Details: Sanded inside of the tail , micro’d and glassed it up



Tuesday, March 17, 2009 - 2 Hours


Summary: Empennage

Details: Repaired tail and micro’d the V-stab



Monday, March 16, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on reforming the tail



Sunday, March 08, 2009 - 5 Hours


Summary: Fuselage

Details: Solder up the antenna connections. Glassed over the antennas and fabricated the tail section to bring it up to level.



Saturday, March 07, 2009 - 4 Hours


Summary: Fuselage

Details: Glassed the inside of the header



Monday, March 02, 2009 - 2 Hours


Summary: Fuselage

Details: Cleaned up inside fuselage and seat flanges. Istalled Marker Beacon antenna. Drilled out inspection plate attachment holes



Sunday, March 01, 2009 - 5 Hours


Summary: Fuselage

Details: Layed up and formed the header



Tuesday, February 24, 2009 - 2 Hours


Summary: Fuselage

Details: Glassed up the front side of the seat flanges



Monday, February 23, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on Flanges for the seat back. and mounted the header.



Sunday, February 22, 2009 - 5 Hours


Summary: Fuselage

Details: Laid up the firewall with 6 layers of BID. Laid up some flanges for the seat back.



Saturday, February 21, 2009 - 3 Hours


Summary: Fuselage

Details: Made flanges for the seatback



Thursday, February 19, 2009 - 2 Hours


Summary: Fuselage

Details: Floxed in the right longeron



Wednesday, February 18, 2009 - 2 Hours


Summary: Fuselage

Details: Floxed in the left longeron. Many clamps!



Tuesday, February 17, 2009 - 2 Hours


Summary: Fuselage

Details: Cut out the longeron inserts and leveled the fuselage.



Monday, February 16, 2009 - 4 Hours


Summary: Fuselage Bulkheads

Details: Layed up the rear, mid, and baggage bulkheads with BID



Sunday, February 15, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded to shape the header and seat back. Micro’d the mid-bulkhead and baggage bulkhead into position. Micro’d the edges of the inspection plate



Saturday, February 14, 2009 - 4 Hours


Summary: Fuselage

Details: Sanded and Micro’d bulkheads and fitted into place. Cut out inspection hole, sanded and put into place to make lay-up for flange. Laid up 6 layers of BID



Thursday, February 12, 2009 - 2 Hours


Summary: Fuselage

Details: Installed rear bulkhead



Wednesday, February 11, 2009 - 4 Hours


Summary: Fuselage rear bulkhead.

Details: Sanded and fitted the rear bulkheads. Floxed in the rear bulkhead. Glassed the other side of the seat back – BID. Glassed both sides of the firewall support.



Tuesday, February 10, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Monday, February 09, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Sunday, February 08, 2009 - 4 Hours


Summary: Fuselage

Details: Sanded the fuselage, cut and shaped the bulkheads, glassed one side of the seat back – 1 UNI and 1 BID



Thursday, February 05, 2009 - 2 Hours


Summary: Fuselage

Details: Worked on fuselage



Monday, February 02, 2009 - 2 Hours


Summary: Fuselage

Details: Helped Paul micro and lay up the inner radius and micro’d his bulkheads



Saturday, January 31, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded and prepped the inside of the fuselage. Joined fuse sections



Friday, January 30, 2009 - 3 Hours


Summary: Fuselage

Details: Sanded again and added more micro to smooth out the transition edges



Thursday, January 29, 2009 - 2 Hours


Summary: Fuselage

Details: Sanded the inner radiuses of the fuselage and added micro to them



Wednesday, January 28, 2009 - 5 Hours


Summary: Fuseslage - forming the front half.

Details: Put fuselage on the formers and micro’d in the radius strips. Scored my rear fuselage with more relief lines. Micro’d the openings. Sanded inner front radiuses.



Tuesday, January 27, 2009 - 2 Hours


Summary: Fuselage - Firewall.

Details: Floxed firewall to front of fuselage



Monday, January 26, 2009 - 4 Hours


Summary: Fuselage Firewall mount.

Details: Checked alignment of the front firewall mount. Cut out firewall and glassed both side



Sunday, January 25, 2009 - 4 Hours


Summary: Fuselage

Details: Lined up Fuselage halves and then glassed them together



Friday, January 23, 2009 - 3 Hours


Summary: Fuselage - Connecting front and rear fuse.

Details: Cut rear fuse bottom and aligned for attachment to the front fuselage bottom.



Thursday, January 22, 2009 - 2.5 Hours


Summary: Fuselage

Details: Slurried and applied 1 layer of UNI and 1 layer of BID to the left side of the fuselage. Covered with peel-ply



Wednesday, January 21, 2009 - 3 Hours


Summary: Fuselage

Details: Slurried and applied 1 layer of UNI and 1 layer of BID to the right side of the fuselage. Covered with peal-ply.



Tuesday, January 20, 2009 - 2 Hours


Summary: Chris - fuselage

Details: Sanded and micro filled the fuselage radius



Monday, January 19, 2009 - 2 Hours


Summary: Fuselage

Details: Cut out bulkheads and sanded the fuselage radius



Sunday, January 18, 2009 - 4 Hours


Summary: Fuselage and Bulkheads

Details: Micro’d and glassed the backsides of the bulkheads and then sanded the fuselage



Saturday, January 17, 2009 - 6 Hours


Summary: Fuselage

Details: Micro’d 1.5” strips on Fuselage to fill in the gaps. Cut out bulkheads and laid them up with fiberglass and micro



Friday, January 16, 2009 - 4 Hours


Summary: Fuselage

Details: Built Formers “C” and “E” and then attached them to the fuselage. Cut out 12 – 1.5” strips of ½” foam and micro’d them onto the fuselage to form the fuselage radius.



Thursday, January 15, 2009 - 1 Hours


Summary: Fuselage

Details: Built former A and attached it to the fuselage and shape sanded the fuselage sides.



Wednesday, January 14, 2009 - 3 Hours


Summary: Assemble fuselage formers

Details: Built forms for fuselage and attached bottom and sides to the forms



Sunday, January 11, 2009 - 4 Hours


Summary: Rear fuselage

Details: Cut out sides and bottom for the front fuselage. Sanded leading edge on H-Stab. Helped Paul with his rear fuse.



Monday, January 05, 2009 - 2.5 Hours


Summary: Fuselage bottom

Details: Slurried and glassed the inside bottom of the forward fuselage. Paul - Sanded joggle in bootom, other layups



Sunday, January 04, 2009 - 4 Hours


Summary: Fuselage bottom

Details: Slurried and glassed the other side of the rear bottom fuse



Saturday, January 03, 2009 - 5 Hours


Summary: Fuselage bottom

Details: Slurried and glassed rear bottom fuse.



Friday, January 02, 2009 - 3 Hours


Summary: Rear bottom fuselage

Details: Fit and micro’d together the rear bottom fuse.



Thursday, January 01, 2009 - 2 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Wednesday, December 31, 2008 - 1.5 Hours


Summary: Rear bottom fuselage

Details: Made template for rear bottom fuselage.



Tuesday, December 30, 2008 - 1 Hours


Summary: Rear bottom fuselage

Details: Micro'd flange, second coat, Trial fitted the rear fuse and cut new fuse pieces.



Monday, December 29, 2008 - 1 Hours


Summary: Rear fuselage bottom

Details: Cut out new sections fro the rear fuse bottom for a better fit.



Sunday, December 28, 2008 - 5 Hours


Summary: Worked on fuselage

Details: Laid up the fuselage bottom on the bottom side.



Saturday, December 20, 2008 - 3 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Friday, December 19, 2008 - 1.5 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Thursday, December 18, 2008 - 2.5 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Wednesday, December 17, 2008 - 2 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Tuesday, December 16, 2008 - 2 Hours


Summary: Worked on fuselage

Details: Worked on fuselage



Sunday, December 14, 2008 - 4 Hours


Summary: Fuselage

Details: Micro'd and glassed inside of fuselage sides.



Sunday, December 07, 2008 - 7 Hours


Summary: Fuselage sides

Details: Micro'd and Laid up UNI and BID on the fuselage sides then peal plied it all.



Monday, December 01, 2008 - 2 Hours


Summary: Fuselage

Details: Sanded joggles into the front fuselage sides and cut out pieces for rear bottom (tail cone) of the fuselage



Sunday, November 30, 2008 - 3 Hours


Summary: Fuselage construction begins!

Details: Cut out front bottom and front sides for Fuselage.