krsuper2
Chris's build site for the
construction
CURRENTLY WORKING ON
Fuselage

TOTAL AIRCRAFT BUILD TIME
750.42 Hours

PROGRESS CHARTS







DETAILED PROGRESS

Empennage 376.5 Hours
Fuselage 306.28 Hours
Wing 50.5 Hours
Shop Supplies 2 Hours
Miscellaneous 13.6 Hours
Tools 1.01 Hours
Diversion time 0.5 Hours
Canopy 0.03 Hours

BACK TO MAIN


last update
SITE WAS UPDATED ON
Monday, May 31, 2010

contact 
SEND AN EMAIL
Chris @ digflying.com

specs 
WHAT MAKES IT TICK
Length                   19'
Wing Span             24'
Total Wing Area     93 ft^2
Empty Weight         750
Gross Weight        1200
Useful Load           450
Fuel Cap                26 gal
Stall Speed            48 mph
Maximum Speed    170 mph
Cruise Speed        140 mph
Range                    600 miles
Engine                   Corvair 2700
Power                   100 HP
Power Loading     12 lbs/hp
Wing loading         12.5 lbs/sq ft
Fuel consumption  5.5 gph
Seating                  2 across
Gear                      Tri-Gear
Cabin Width           43"

disclaimer
THE LEGALESE
This website was built to document my work on my KRSuper2 in compliance with the FAA requirements needed to certify my aircraft. My experiences and comments are by no means to be considered as instructions on how to build a KRSuper2 or any other aircraft.

A Modern take on a classic aircraft with an all composite design
Diversion time
welcome
detailed progress report

Saturday, August 01, 2009 - 0.1 Hours


Summary: Took time out to go to Oshkosh.

Details: We headed to Oshkosh and went to the show for 3 days. Unfortunately we missed the KR2 guys, they all headed out before the weather moved in.



Saturday, June 27, 2009 - 0.1 Hours


Summary: Took time off to go to the Waco Fly-in at Wynkoop Airport -6G4

Details: Checked out the antique aircraft and Spent some time checking on an RV4 that is being built there.



Friday, May 15, 2009 - 0.1 Hours


Summary: Bob Benett's KR2S

Details: Visited local builder form the EAA 402, Bob Bennett. Checked out the nice work that he is doing on his KR-2S.



Friday, April 10, 2009 - 0.1 Hours


Summary: Cleanup time

Details: Cleaned out the garage



Thursday, April 09, 2009 - 0.1 Hours


Summary: Cleanup time

Details: We need more space so we moved the Horizon fuselage to Area 52